Antari DNG-100 User Manual Page 4

  • Download
  • Add to my manuals
  • Print
  • Page
    / 12
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 3
4
Setup
Remove all packing materials from shipping box. Check that all foam and plastic padding is
removed, especially in the nozzle area.
Attach power cord to rear of fog cooler.
Place the fog cooler’s intake within six inches (15 cm) of a fog machine’s output.
Plug power cord into a grounded electrical outlet. Turn power switch on rear of unit to ”ON”
position.
Waiting time for cooling is approximately two minutes.
Operation
ANTARI Fog Cooler’s output volume is determined by the output volume of the fog machine to
which it is attached.
Your ANTARI dealer has the hoses and adapters required for an optimal installation of the fog
cooler. See the two illustrations below:
In the first example, a fog conducting hose (FT-10) is attached to a fog machine’s output nozzle via an
adapter (FTA-1 or FTA-2) and then connected to an adapter (FTA-10) attached to the fog cooler’s
intake.
In the second example, substitute the guide plate (FTA-12) with a fog conducting hose (FT-10) that
attaches to the front of the fog cooler via an adapter (FTA-11). This configuration allows the fog
cooler’s output to be guided to a desired area without being affected by air currents generated by
movement, wind, fans or air conditioners.
During operation, if you experience mechanical noise or no output, unplug immediately. Check power
connections and fog machine operation. Wait three minutes and then plug the unit in again. After
plugging the unit in and turning it on, wait for two minutes. If the problem persists, discontinue
operation and return the machine to your ANTARI dealer.
Maintenance
Clean the water carrier regularly to avoid overflowing.
Clean with a damp cloth.
Store in a dry place.
Save these instructions
Page view 3
1 2 3 4 5 6 7 8 9 10 11 12

Comments to this Manuals

No comments